Showing posts with label 1:56. Show all posts
Showing posts with label 1:56. Show all posts

Tuesday, 31 March 2020

Top Secret Nazi Dachs Werks - April 1st 2020

The past few weeks have been fraught with uncertainty, and I must admit to being a little disappointed that our opportunity to celebrate VE day at 'Salute' has been postponed for a year.  I am however very much heartened by the development of the Excel venue into the new NHS Nightingale and am hopeful for the speedy recovery of all those who it may serve.
Michael and I have been working tirelessly preparing 'Schloss Itter' for its debut which will now come much later than anticipated.  

However, today, (April 1st 2020) I can welcome all through the doors for a sneak preview into one of its darkest chambers.





In the autumn of 1942 the Nazi high command were becoming desperate.  Significant Allied gains across northern France, had progressed into areas from which V1 rockets had previously been launched with devastating effect.  As the V1's were forced to retreat, their limited range rendered them useless in pursuit of their cowardly terror attacks upon London and the south-east.  In response, the Nazi high-command began to devise schemes which might extend their shelf-life.


Unbeknown to many, indeed to history itself, Schloss Itter played host to the Nazi top secret 'Dachs Werks', a classified facility wherein the most eccentric minds of the Third Reich conceived heinous equipment with which to pursue their cause.
The V1 problem proved to be a challenge too far it would seem, as attempts to extend its range such as making the wings flap and injecting the engines with lightweight oxygen all proved futile.  
In desperation, Hitler ordered that the stockpiled weapon be readied for the ultimate defence of his Austrian stronghold wherein, and if necessary, he would be prepared to make his last stand.

As proof that fiction is often more ridiculous than fact, we can reveal some of the secrets of the Dachs Werks here today, April 1st, 2020, having uncovered some old documents from the Itter vaults.

Clearly, these archive documents detail the development of the weapon, and show how military planners were to maintain the V1's effectiveness as fuel supplies became scarce.





Some photographs from the period have survived too.

The facility was overseen ruthlessly by Katja Kitzler who reported directly to the Nazi high command. Never without her clipboard Katja was a hard task master determined to keep her team focused on the task in-hand.  So feared was she, that her colleagues set her feet in concrete to prevent her running and telling tales on them.


Wilhelm Schwarzenplunger (Billy to his friends) was the chief mechanic and artisan with the thermal lance.  It is thought that Wilhelm was a Swedish secret agent who had been working undercover for a Nazi sympathising industrialist hoping to cash-in on the reconstruction of Europe.  It is alleged that he used his spare time at the Dachs Werks to perfect automated furniture production.  
Although we may never know for sure, it is believed that many of his signature 'Billy' bookcases have found their way into homes the world over.  



Dr Ivan Fecktion, the infamous immunologist, was plagued* with a constantly streaming nose.  He was the real genius behind the Dachs Werks, until his experiment with launching a V1 using a medieval siege catapult.  During this experiment he unfortunately caught his index finger in the trigger mechanism causing a severe swelling.  After that fateful occasion he became known (behind his back) as Dr Wurstfinger.



Professor Bergen A. S. Frantz was an experimental chemist charged with developing cellulose based rocket fuel.  His 'herbology' experiments within the lab however were not appreciated by Fraulein Zimmermädchen.
On one occasion she caught him extracting cellu-oil from her prize winning mandrakes without her permission, and they never spoke again!!

Professor Frantz would occasionally moonlight as a Vet, and was often  seen in his uniform of armpit length rubber gloves.






We hope you have enjoyed this visit to the Schloss Itter Dachs Werks.  

Stay safe everyone, and take care.

James



*no pun intended

Monday, 3 February 2020

2020 Catch-up

The past few moths have flown past, and although workbench output has been high, content to these pages has been somewhat limited.  
The weeks leading from the October school holiday through to Christmas were consumed almost entirely with progressing the baseboards for the Itter project.  As some will know, I changed jobs at Christmas and so January has been really busy on the work front settling into my new position and getting things up and running.
I'm pleased to report that whilst challenging, my new role is proving to be very rewarding, and now that the routine of working in a new school has become established I'm keen to update this humble blog with the progress I have been making across several fronts.

Firstly, an update on the Vickers Vernon, which sadly took a back seat pre-Christmas during the big push on the Castle project.  However, I have finished all the final design work, and am now in a position to cut the final wing and tail-feather parts. Hopefully we should see that situation remedied in the coming days so (fingers-crossed) the next post will show some physical progress.  I plan to make the drawings/CAD files available to whoever might find them useful and am currently investigating a suitable hosting space - but more of this in an upcoming post

In other news, whilst no longer working day-to-day with Michael, I have been popping in to see him on the occasional evening and the progress he is making with the Itter terrain is incredible.  I've just enjoyed his last post and can confirm all is in fact even more superb in the flesh, as it were.  
During these visits we have discussed several scenic items which will help tell the story of the battle.
I include my works-in-progress below to give a flavor of what I've been up to.

The first item will be an Inn.  Michael was keen to give an illusion of the castle's proximity to the village of Itter, which although is very close to the Castle approach is sadly too far away to fit onto our boards.  Therefore, just one building will be modeled, atop the hill on the castle approach.
Not having space to recreate a full-size replica of the inn at Itter, I have opted for a more modest affair based upon a photo of an Austrian chalet found on the internet.


These pictures show the basic design, which when complete will have a full interior.


Here is the hastily painted prototype, still not finished, but giving a good representation of what the final outcome might look like.  Michael has lots of plans for this structureand I can't wait to see it finally in place on the castle boards.



Next up, Michael was keen to include a mini saw mill within the tabletop, as an added feature which I'm sure will add an extra element to the game play, if only as cover for the SS in their attempt to storm the castle.  Looking for inspiration I found this image of Birkkarhütte on the internet. 



Thinking it might make a useful woodsman's hut, I set about recreating a smaller version complete with some suitable paraphernalia. Although sadly not the kiddies bicycle!


I'm on the look-out for a suitable stationary engine to power the saw bench - which may end-up being a project in itself.


And so to my final piece for today's post.  
Within the woods which surrounded Schloss Itter there was an electrical transformer or substation, the exact details of which are unknown to us.  We do know however that there was a machine gun nest nearby, possibly within it and Michael was keen that we recreate this element.
Not knowing quite what such a thing might look like, but being mindful that it should be instantly recognisable for what it is, I have come up with this.  Hopefully some insulators, paint and suitable 'Achtung!' flashes will help with the illusion.
Yes it's probably a little industrial for the location and period, but when complete I am sure will be weathered down and blended in with Michael's usual skill.  





And here is a collective shot of my output for this last week.  The side wall of the inn looks at though it's about to fall over!  At this stage the building hasn't been glued together and is all just balancing. 
There's still much to do, but hopefully these works-in-progress whet the appetite just a little.
I'll show some more progress, and hopefully a picture or two of these pieces in position just as soon as I get the chance and maybe delve a little deeper into the details of each piece.



 TTFN,

James

*** STOP PRESS ***

I'd written this post earlier today, and have now just returned from visiting Michael, and have had the chance of some in-situ photography.  So here's a little treat of one of the installations...




Wednesday, 18 December 2019

The making of the Castle Itter Christmas Card

With thoughts of the end of the school term, and the seasonal winding down of work related activities, Michael and I turned our thoughts towards yet another distraction.  This time something suitably festive for the blog.  Naturally, it needed to be related to the ongoing castle project, and as we had a spare gatehouse, the concept quickly established itself!

Merry Christmas everyone!

To begin our festive scene, a suitable plywood base was found to which an MDF base for the scene was fitted.  The gaps were filled with expanding foam which was carved to shape and finished with a generous smear of decorators caulk.
Some BIC pen tubes were added for the tree trunks which were suitably 'enhanced' with some Vallejo earth texture paste.




The addition of some 'Awdry' patent trees helped to fill the scene.  Michael has become quite adept at making these, I'm sure we'll be treated to a write-up soon.


Some reindeer were corralled, and all seemed been going well until someone forgot the safety catch!


However, keen to make progress, we disguised the deceased reindeer by firmly affixing them into the upright position on some sticks, Harnessing them with painted masking tape and some red thread from Michael's sewing box. 




At this stage we had become a little overwhelmed with the static grass, and so called in the heavy plant to help clear the mess.  A 28mm bobcat, (I think it's the best thing on the internet!)

After some initial reluctance, the reindeer were harnessed to the Sherman. 
Upon learning to work as a team, they enjoyed some skiing across the bridge.
Finally, he elements for the photo-shoot were assembled together with some nicely painted resin gifts.  

All had been going well until, there was an unfortunate Green on Red incident in the lead-up to the photoshoot.


Then an inundation of heavy snowfall threatened the whole affair.  So once again the Bobcat was pressed into service....

...and Mr Awdry kindly donated his cape, which made a most useful backdrop.
And thus the scene was set...

The Fieseller Storch being a  totally unnecessary but fun addition.




Merry Christmas everyone!!, and a big thank you to all who have followed and supported our project.



Finally, I couldn't think of a caption for this photograph.  Suggestions in the comments?




Monday, 9 December 2019

Work in progress

I've not posted for a few weeks, as the pace of things has been quite full-on, and finished projects have been somewhat thin on the ground.  A change of job for me post Christmas has forced me to focus upon completing as much of the ground work of the Itter project as possible, as the collaboration with Michael will inevitably become less easy upon my move.  Michael and I both teach, in adjacent studio spaces, which has been a privilege whilst working on this project.  I will of course continue with my involvement in the project after my move, and look forward to meeting folks at Salute.  However, and as I hope you can understand, the more recent focus has been to push the project forward as much as possible.  As is the way, much of this work is not very glamorous and I hadn't felt it worth sharing.
However, Michael's recent work in progress post seemed to peak some interest, and so rather than post nothing I'm uploading some of my own photographs of the build in the hope they provide some inspiration and insight to how we're getting on.


The basic structures are all built-up from laser cut modules, all 3d modelled in advance to ensure they'd all fit as we hoped.  This has been a time consuming process and probably the reason for our overall progress looking a little slow at this point.  However, we are accelerating now and I think this time has been well spent, as it has allowed us to scale down and adjust the plan to fit the board without compromising the feel of the overall scene.  I'm hopeful that when finished, the model photographs will compare well with the original.


The picture below is one of my favourites.  The landscaped board looks tiny when in fact its huge on its own!  My word, what were we thinking!!



This picture shows the principle of laser cutting a 'live hinge' to allow the material to flex.  In this case the serrations were cut radially to allow the ramp to follow a curve.


The same technique is employed here to create a curved retaining wall.


A bit of filler to texture and the effect is worth the effort.



The sides of the bridge were clad with foam...




So that the stone detail work could be scribed on.  The chipped rendering to the top of the bridge is just playground sand PVA'd into place.



Shaped profile boards provide a robust edge to each base board.


Expanding polyurethane foam from a can has been used to create the basis for the landscaping.  A very quick, lightweight and strong method which I can heartily recommend.  I'd advise using gun grade material, which requires an applicator gun.  The cost of the gun being worthwhile for the benefit of a more controlled application.

















Here the RFC pilots and Major John Howard are testing the integrity of the embankment!



Stilts were made to hold the castle at the correct elevation, and these were fixed into place with yet more foam.


And the perimeter walls added to the base.  Like the bridge structure, these will also be covered with foam which will be scribed to represent rough stone.





Whilst the castle board progressed, Michael used a mixture of decorators caulk, tile grout, bark and stone to texture the bridge board.  It is quite hard to judge the progress in this photo but he has been doing some sterling work in bringing the board to life.











Here, the RFC pilots are crossing the bridge in search of their Vickers Vernon!


Michael is becoming a dab-hand at tree manufacture!



The castle interior.  The rooms will all be furnished and have detailed wall panelling.  Just visible on the third floor are pieces built by a pupil of ours who has taken on the task of designing the armoury.  These will hold rifles, machine guns and ammunition.  He has also kindly contributed a scratch-built grand piano for the music room, but more of that at a later date.


The third board is being landscaped too.  Same techniques as before.





Well done if you've scrolled down this far!!  

These pictures are a little behind the curve time-wise.  I'll leave the joy of the latest progress to the most excellent 28mmvictorianwarfare.


Finally, I shall leave this post here with the photograph above, being a little hint towards a most wonderful development in our projects' progress.  We will definitely post all about it once we've decided how to do it justice.  
Until then, I think this figure (currently in primer), may well prove to be one of Michael's most satisfying painting jobs to date.


Best wishes everyone,

James